 |
|
Please click thumbnails below to view.
|
|
 |
|
|
Glahe & Associates Inc utilized RTK GPS and conventional total stations to stake multiple proposed routes for a large scale fiber optic network on behalf of the Bonneville Power Administration. Section breakdown and monument recovery were achieved via our Blue Tooth ready Trimble R-6 GPS while existing power line structures where documented via reflectorless total station. Potential fiber optic network routes were staked between the McNary to Franklin #2 line and a wind turbine installation near Kennewick Washington. |
|  |